15 percent of the actual value of each of the following:
- during the awarding of the contract
- upon finalization of the contract
- installation of engines, weapons, communications, sensor systems, and auxiliary machinery
- during the acceptance trials
10 Percent Each of the Following:
- for the laying of the keel of the ships
- upon delivery of the frigates to the Philippines
- for the construction of the vessel
- upon completion of the warranty period
Source: http://www.pna.gov.ph/index.php?idn=1&sid&nid=1&rid=608399